Aqua Lung SEA MK Bedienungsanleitung Seite 11

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 10
11SEA USER'S MANUAL
8. When at least two minutes have elapsed, and air can no longer be
heard owing from the supply cylinder into the SEA, turn the supply
cylinder valve completely open.
9. To conserve the limited air supply of the SEA, it is strongly recom-
mended that you perform a pre-issue inspection of the second stage
purge while it is connected to the supply cylinder as follows:
a. Depress the purge button to ensure that sufcient airow is
provided to clear the second stage of water.
b. Immediately after releasing the purge button, listen closely to en-
sure that the second stage does not continue to ow any air.
10. While holding the rst stage and ll adapter secure, turn the SEA
valve handwheel clockwise until it stops and the red indicator is visible.
Turn the handwheel of the supply cylinder valve clockwise until shut.
11. Hold the second stage purge button depressed until airow can no
longer be heard from the second stage and the LP hose between the
rst and second stages is completely depressurized (N/A to PN 108382
& 108545).
12. Open the pressure relief screw on the ll adapter to relieve the line
pressure.
13. While supporting the SEA cylinder with one hand, turn the yoke
screw of the ll adapter counterclockwise to loosen until the complete
system can be lifted off and removed from the supply cylinder valve.
14. While holding the SEA secure, turn the ll adapter counterclock-
wise at the tting to loosen and remove from the rst stage. Replace
the dust cap over the inlet tting, and tighten the yoke screw nger tight.
15. Thread the ll port plug into the ll port until nger tight.
Seitenansicht 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 31 32

Kommentare zu diesen Handbüchern

Keine Kommentare